PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing safety net around 4th Floor Facing South (800x600).jpg Installing steel angles and safety cables (1) Facing North-East (800x600).jpg Installing steel angles and safety cables (2) Facing North-East (800x600).jpg Layed out gravel at Cafeteria (104), and Main Loby (102). Facing East (800x600).jpg Metal decking at 4th Floor Facing East (800x600).jpg Started fixing the main steel column Facing East  (800x600).jpg
Previous pageNext page Installing steel angles and safety cables (1) Facing North-East (800x600)
Installing steel angles and safety cables (1) Facing North-East (800x600)